Files
KanbanGit/docs/releases/0.1-kanban-foundation/04-board-columns-and-project-workflow-settings.md
2026-03-25 00:07:30 +01:00

31 lines
971 B
Markdown

# 04 Board Columns and Project Workflow Settings
## Goal
Allow each project to configure its own Kanban board structure through project settings.
## Requirements
- Each project must have exactly one board configuration context.
- Board columns are project-specific and ordered.
- A project admin or otherwise authorized user can:
- create columns
- rename columns
- reorder columns
- delete columns
- Board columns define the valid in-board statuses for tickets.
- The backlog remains separate from board columns and is not just another normal board column.
## Acceptance Criteria
- A project can have any number of board columns.
- Column order is reflected consistently in project settings and the board UI.
- Deleting or changing columns is protected by project-level permissions.
- Ticket status validation only allows backlog or one of the project's configured board columns.
## Out of Scope
- Swimlanes
- WIP limits
- Board automation rules