Files
KanbanGit/docs/releases/0.1-kanban-foundation/04-board-columns-and-project-workflow-settings.md
T
2026-03-25 00:07:30 +01:00

971 B

04 Board Columns and Project Workflow Settings

Goal

Allow each project to configure its own Kanban board structure through project settings.

Requirements

  • Each project must have exactly one board configuration context.
  • Board columns are project-specific and ordered.
  • A project admin or otherwise authorized user can:
    • create columns
    • rename columns
    • reorder columns
    • delete columns
  • Board columns define the valid in-board statuses for tickets.
  • The backlog remains separate from board columns and is not just another normal board column.

Acceptance Criteria

  • A project can have any number of board columns.
  • Column order is reflected consistently in project settings and the board UI.
  • Deleting or changing columns is protected by project-level permissions.
  • Ticket status validation only allows backlog or one of the project's configured board columns.

Out of Scope

  • Swimlanes
  • WIP limits
  • Board automation rules